Now you can use the EVA graph to show project progress without sharing sensitive cost information. Display Earned Value Graph as a percentage of total.For more technical details about the upgrade process see: FAQ: Upgrading Pro to 4D ProĬlick the links below to download the latest version or v isit Software Downloads in the Bentley CONNECTION Center.To learn about the new workflow, see: Collaborating on a cloud-hosted 4D project.For more details on SYNCHRO 4D: SYNCHRO 4D 2020 Release Announcement.Iray is additional to be used with SYNCHRO Pro. Meanwhile, SYNCHRO Pro continues as the 4D market leading desktop application for standalone and file-based 4D Planning, Scheduling and Visualization. SYNCHRO 4D Pro also includes Iray with no extra cost. Behind the Control 4D Cloud Service is Bentley’s iModel/ iTwin technology. 4D project data is more accessible than ever. Plan the project through 4D Pro, view and playback 4D sequence on the web, and perform model-based progress tracking through mobile. In this 2020.1 (v6.3) release, we are introducing SYNCHRO 4D Pro as a new desktop product that includes all SYNCHRO Pro’s functionalities and brings more value to users and construction projects by including Control 4D Cloud Service to feature our vision for collaborative 4D planning, scheduling and visualization. known crash issues: /.Introducing SYNCHRO 4D Pro as a new product I found the following threads online, which i don't know if they are relevant for my case: When I open the Synchro file again, the building geometry is gone (Capture 2), and when I click on 3D Objects > CON base + SITE working areas, Synchro crashes and gives the error message (Capture 3). I save and close Synchro (please see Capture 1 - the 3D window - and Capture4 - how the resources are arranged)

I link the the building 3D objects (.fbx) to the task, and import/add equipment (.dwf) and paths. I'd like to mention that I had huge problems with this import too, saying that the ASTA file could not be loaded because it was being used, when nobody was actually using it, luckily solved by the IT dep I import the ASTA schedule ( ASTA PowerProject 16.0.01). The one I would like to report and ask for help is the following: I want to highlight that before the new update, I used to work with Synchro Pro, and very rarely had issue with it in terms of software stability.

Since then, I've been having continuous issues with it. My company has recently renewed the Synchro subscription, and we opted for the new Synchro 4D Pro. I hope you are all doing good and keeping safe.